Tri-Cities Cluster Improvements

 

 

 

 

 

Tri-Cities High School

Major building renovation and modification of existing building and site improvements which may:

• Replacement of floor finishes as needed.

• Replace as needed marker/ tack boards, lockers, toilet accessories and toilet partitions.

• Replace as needed fixed furniture such as cabinets, countertops, blinds and fixed seating.

• Painting as necessary.

• Replace acoustical ceiling grid and tile as required.

• Replace roofing.

• Replace and/or repair domestic water piping as required.

• Major HVAC upgrade and replacement.

• Replace kitchen exhaust hoods and fans.

• Update building’s fire alarm system as needed.

• Repair and/or replace walkway canopies.

• Update elevator controls.

• Replace and/or refinish stage wood flooring.

• Revise electrical service to kitchen and serving line equipment as needed.

• Reconfigure kitchen and dining room for additional serving lines.

• Replace dish machine and all associated equipment.

• Repair, resurface and restripe parking lots and entrance drives as required

Start Design: Complete

Start Construction: Summer 2013 & Summer 2014

Final Completion: Fall 2014

 

Paul D. West Middle School

Renovation and modification of existing buildings and site improvements which may include the following:

• Replacement of floor finishes as needed.

• Painting as needed.

• Repair metal roofing.

• Repair, resurface and restripe entrance drives as required.

Start Design: No Later Than Spring 2015

Start Construction: As Soon as Summer 2016 &

No Later Than Summer 2017

Final Completion: No Later Than Fall 2017

 

Woodland Middle School – (2007)

 

New College Park Elementary School

Start Design: Complete

Start Construction: In Progress

Final Completion:  Fall 2015

 

Conley Hills Elementary School

Major building renovation and modification of existing building and site improvements which may include the following work:

• Patch and repair of exterior walls.

• Replacement and/or repair of selected doors, windows and hardware.

• Replace as needed marker and tack boards, lockers, toilet accessories, toilet partitions and shelving.

• Replacement of floor finishes as needed.

• Replace gymnasium flooring surface (Note 1).

• Painting as necessary.

• Replace and/or refinish stage wood flooring

• Replace and/or repair ceramic wall finish as required.

• Replace and/or repair ceramic and quarry floor tile as required.

• Replace acoustical ceiling grid and tile as required.

• Replace and/or repair domestic water piping, sanitary sewer and plumbing fixtures as required.

• Major HVAC system replacement.

• Replace kitchen exhaust hood and fans.

• Upgrade fire protection sprinkler system as required.

• Update building’s electrical systems as required.

• Replace selected light fixtures in ceiling grid.

• Update intercom and sound systems as required.

• Update security system as required.

• Replace canopy at student drop-off area.

• Energy conservation improvements as needed.

Start Design: In Progress

Start Construction: As Soon as Summer 2015 & No Later Than Summer 2016

Final Completion: No Later Than Fall 2016

 

Hapeville Elementary School

Major building renovation and modification of existing building and site improvements which may include the following work:

• Renovate administration lobby area.

• Replacement and/or repair of selected exterior doors and windows.

• Replacement and/or repair of selected interior doors and hardware.

• Painting as necessary.

• Replace as needed marker and tack boards, lockers, toilet accessories, toilet partitions and shelving.

• Replacement of floor finishes as needed.

• Replace gymnasium flooring surface.

• Replace and/or refinish stage wood flooring.

• Replace and/or repair ceramic and quarry floor tile as required.

• Replace acoustical ceiling grid and tile as required.

• Replace and/or repair plumbing and/or plumbing fixtures as required.

• Replace selected light fixtures in ceiling grid.

• Update intercom and sound systems as required.

• Major HVAC upgrade and replacement.

• Update fire alarm system as required.

• Update security system as required.

• Upgrade elevator controls.

• Add fly fan at kitchen’s entrance door.

• Energy conservation improvements as needed.

• Repair, resurface and restripe parking lots and entrance drives as required.

• Replace and/or repair perimeter fencing around site.

• Replace sidewalks as necessary.

• Replace, upgrade and/or install new site lighting.

Start Design: In Progress

Start Construction: In Progress

Final Completion:  Fall 2014

 

Hamilton E. Holmes Elementary School – (2003)

 

Mount Olive Elementary School Replacement

New replacement school with fifty-four (54) instructional units and associated site improvements.

Start Design: Complete

Start Construction: In Progress

Final Completion:  Fall 2016

 

Parklane Elementary School

Renovation and modification of existing buildings and site improvements which may include the following:

• Replacement and/or repair of selected doors, windows and hardware.

• Painting as necessary.

• Replace as needed marker and tack boards, toilet accessories, toilet partitions and shelving.

• Replacement of floor finishes as needed

• Replace acoustical ceiling grid and tile as required.

• Replace gymnasium flooring surface. (Note 1)

• Replace and/or repair plumbing fixtures as required.

• Update building’s HVAC system and controls as required.

• Replace kitchen exhaust hood and fans.

• Update fire alarm system as required.

• Revise electrical service to kitchen and serving line equipment as needed.

• Energy conservation improvements as needed

• Repair, resurface and restripe parking lots and entrance drives as required.

• Replace and/or repair site retaining wall.

• Replace and upgrade site lighting.

Start Design: Complete

Start Construction: Summer 2014

Final Completion: Fall 2015

 

* Additional work at each campus may also include the following improvements as needed: furniture and equipment replacement, visitor identification equipment, access control upgrades and surveillance equipment. Other improvements associated with the integration of system wide technology standards, educational specifications and design requirements may also be included per Fulton County Schools’ Board policy.

** Note 1 - Floor covering replacements for elementary schools will be accelerated with work starting Summer 2013.