Fulton County Schools
You are leaving the Fulton County Schools website. Please select continue to proceed to the requested page or you may close this window to stay on the current page.

Loading...
 

 

 

 

Northview Cluster Improvements

 

 

 

 

Northview High School

Renovation and modification of existing buildings and site improvements which may include the following:

• Replacement of floor finishes as needed.

• Update building’s HVAC controls as required.

• Painting as needed.

• Upgrade exhaust system for art room kilns.

• Add exhaust hoods for nutrition lab stoves.

• Repair, resurface and restripe parking lots and entrance drives as required.

• Replace and/or repair sidewalks as necessary.

Start Design: Winter 2015

Start Construction: Summer 2016

Final Completion: No Later Than Fall 2017

 

River Trail Middle School

Renovation and modification of existing building which may include the following:

• Replacement of floor finishes as needed.

• Painting as needed.

Start Design: Winter 2015

Start Construction: Summer 2016

Final Completion: No Later Than Fall 2017

 

Findley Oaks Elementary School

Major building renovation and modification of existing building and site improvements which may include the following work:

• Replacement of floor finishes as needed.

• Replace gymnasium flooring surface.(Note 1)

• Replace as needed marker and tack boards, lockers, toilet accessories, toilet partitions and shelving.

• Replace acoustical ceiling tile and grid as required.

• Painting as necessary.

• Major HVAC system replacement.

• Add fly fan at kitchen’s entrance door.

• Revise electrical service to kitchen and serving line equipment as needed.

• Energy conservation improvements as needed.

• Repair, resurface and restripe parking lots and entrance drives as required.

• Replace sidewalks as necessary.

Start Design: Winter 2015

Start Construction: Summer 2016

Final Completion: No Later Than Fall 2017

 

Shakerag Elementary School

Renovation and modification of existing building which may include the following:

• Replacement of floor finishes as needed.

• Replace roofing.

• Painting as needed.

• Update building’s HVAC system and controls as required.

• Provide exhaust system for art room kilns.

• Revise electrical service to kitchen and serving line equipment as needed.

• Energy conservation improvements as needed.

Start Design: Winter 2015

Start Construction: Summer 2016

Final Completion: No Later Than Fall 2017

 

Wilson Creek Elementary School

Renovation and modification of existing buildings and site improvements which may include the following:

• Update building’s HVAC exhaust system as required.

• Replace gymnasium flooring surface. (Note 1)

• Add fly fan at kitchen’s entrance door.

• Replace and/or repair sidewalks as necessary.

Start Design: Winter 2015

Start Construction: Summer 2016

Final Completion: No Later Than Fall 2017

 

 

* Additional work at each campus may also include the following improvements as needed: furniture and equipment replacement, visitor identification equipment, access control upgrades and surveillance equipment. Other improvements associated with the integration of system wide technology standards, educational specifications and design requirements may also be included per Fulton County Schools’ Board policy.

** Note 1 - Floor covering replacements for elementary school gymnasiums are complete.

***Note 2 – Elementary school play equipment replacement is presently under construction.