North Springs Cluster Improvements

 

 

 

 

North Springs High School

Major renovation and modification of existing building and site improvements which may include the following work:

• Building canopy and/or entrance enhancement.

• Replacement and/or repair of selected doors, windows and hardware.

• Replace as needed marker and tack boards, lockers, toilet accessories, toilet partitions and shelving.

• Replace and/or repair fixed casework, countertops, window treatments and fixed seating (if applicable) as necessary.

• Replacement of floor finishes as needed.

• Painting as necessary.

• Replace acoustical ceiling grid and tile as required.

• Update building’s electrical systems as required.

• Update intercom and sound systems as required.

• Update fire alarm system as required.

• Update security system as required.

• Replace chairlift at gym.

• Replace roofing on 1993 Addition.

• Replace and/or repair plumbing fixtures as required.

• Update building’s HVAC system and controls as required.

• Replace and/or refinish auxiliary gymnasium wood flooring.

• Repair, resurface and restripe parking lots and drives as required.

• Repair and/or resurface running track.

Start Design: Complete

Start Construction: In Progress

Final Completion: Fall 2015

 

Sandy Springs Middle School

Classroom addition increasing school capacity by twenty (20) instructional units.

Renovation and modification of existing building which may include the following:

• Replacement of floor finishes as needed.

• Painting as needed.

• Updating security system as required.

Start Design: Complete

Start Construction: In Progress

Final Completion:  Fall 2016

 

Dunwoody Springs Elementary School 

Renovation and modification of existing building which may include the following:

• Replacement of floor finishes as needed.

• Replace gymnasium flooring surface (Note 1)

• Upgrade security system.

Start Design: Winter 2015

Start Construction: Summer 2016

Final Completion: Summer 2017 (if needed)

 

Ison Springs Elementary School – (2009)

 

Spalding Drive Elementary School

Major renovation and modification of existing building and site improvements which may include the following work:

• Patch and repair exterior walls.

• Replacement and/or repair of selected doors, windows and hardware.

• Replace as needed marker and tack boards, toilet accessories, toilet partitions and shelving.

• Replace and/or refinish stage wood flooring.

• Replace acoustical ceiling grid and tile as required.

• Replacement of floor finishes as needed.

• Replace gymnasium flooring surface.(Note 1)

• Repair gymnasium ceiling.

• Replace roofing.

• Replace and/or repair domestic water piping, sanitary sewer system and plumbing fixtures as required.

• Major HVAC upgrade and replacement.

• Upgrade fire protection sprinkler system as required.

• Update building’s electrical systems as required.

• Replace selected light fixtures in ceiling grid.

• Update intercom and sound systems as required.

• Update fire alarm system as required.

• Update security system as required.

• Replace kitchen dish machine and associated equipment.

• Energy conservation improvements as needed.

• Repair, resurface and restripe parking lots as required.

Start Design: Complete

Start Construction: Complete

Final Completion:  Complete

 

Woodland Elementary School

Major renovation and modification of existing building and site improvements which may include the following work:

• Patch and repair of exterior walls.

• Replacement and/or repair of selected doors, windows and hardware.

• Painting as needed.

• Replace as needed marker and tack boards, lockers, toilet accessories, toilet partitions and shelving.

• Replacement of floor finishes as needed.

• Replace gymnasium flooring surface.(Note 1)

• Replace acoustical ceiling grid and tile as required.

• Replace and/or repair domestic water piping and plumbing fixtures as required.

• Replace kitchen exhaust hood and fans.

• Update building’s electrical systems as required.

• Replace selected light fixtures in ceiling grid.

• Replace emergency generator.

• Update intercom and sound systems.

• Update fire alarm system as required.

• Update security system as required.

• Replace elevator controls.

• Revise electrical service to kitchen and serving line equipment as needed.

• Reconfigure kitchen and dining room for serving line relocation.

• Energy conservation improvements as needed.

• Replace and/or repair sidewalks as necessary.

Start Design: Complete

Start Construction: In Progress 

Final Completion:  Fall 2015

 

* Additional work at each campus may also include the following improvements as needed: furniture and equipment replacement, visitor identification equipment, access control upgrades and surveillance equipment. Other improvements associated with the integration of system wide technology standards, educational specifications and design requirements may also be included per Fulton County Schools’ Board policy.

** Note 1 - Floor covering replacements for elementary schoo gymnasiums is complete.

***Note 2 – Elementary school play equipment replacement is presently under construction.