Creekside Cluster Improvements

 

 

 

 

Creekside High School

Major renovation and modification of existing building and site improvements which may include the following work:

• Replace as needed marker and tack boards, lockers, toilet accessories, toilet partitions and shelving.

• Replacement of floor finishes as needed.

• Painting as necessary.

• Replace and/or refinish gymnasium wood flooring.

• Replace acoustical ceiling grid and tile as required.

• Replace roofing.

• Replace and/or repair plumbing fixtures as required.

• Replace domestic water heaters.

• Major HVAC upgrade and replacement.

• Replace fire alarm system and devices as required.

• Update security system as required.

• Upgrade fire protection sprinkler system as required.

• Update building’s emergency electrical systems as required.

• Revise electrical service to kitchen and serving line equipment.

• Reconfigure kitchen and dining room for additional serving lines.

• Repair, resurface and restripe parking lots and entrance drives as required.

• Replace as needed fixed furniture such as cabinets, countertops, blinds and fixed seating.

• Revise electrical service to kitchen and serving line equipment as needed.

• Renovate and reconfigure kitchen and dining room for serving lines relocation, including replacing cooler and freezer.

• Provide energy conservation improvements as needed.

• Repair, resurface and restripe parking lots and entrance drives as required

 

Start Design: In Progress

Start Construction: Summer 2014

Final Completion:  Fall 2015

 

Bear Creek Middle School

Major renovation and modification of existing building and site improvements which may include the following work:

• Replacement of floor finishes as needed.

• Major HVAC system replacement.

• Painting as necessary.

• Replace and/ or repair ceiling finishes.

• Repair, replace and/or refinish exterior walkway canopies.

• Update intercom and sound systems as required.

• Update fire alarm system as required.

 

Start Design: In Progress 

Start Construction:  Summer 2015 

Final Completion: Fall 2016

 

Campbell Elementary School

Renovation and modification of existing buildings and site improvements which may include the following:

• Replacement of floor finishes as needed.

• Repair and/or repair metal roofing as required.

• Painting as necessary.

• Update building’s HVAC system and controls as needed.

• Replace fire alarm system and devices as necessary.

• Revise electrical service to kitchen and serving line equipment.

• Energy conservation improvements as needed.

• Investigate and repair site storm water drainage issues.

• Investigate and repair sewer system issues.

 

Start Design: No Later Than Spring 2014

Start Construction: As Soon as Summer 2015 &

No Later Than Summer 2016

Final Completion: No Later Than Fall 2017

 

Evoline C. West Elementary School

Major renovation and modification of existing building and site improvements which may include the following work:

• Replacement and/or repair of selected doors, windows and hardware.

• Replacement of floor finishes as needed.

• Provide painting as necessary.

• Replace and/or refinish stage wood flooring

• Replace acoustical ceiling grid and tile as required.

• Replace roofing.

• Replace and/or repair sanitary sewer system and plumbing fixtures as required.

• Replace water heaters.

• Update building’s HVAC exhaust system as required.

• Replace selected light fixtures.

• Replace emergency generator.

• Update intercom and sound systems as required.

• Replace fire alarm system and devices as required.

• Upgrade elevator controls.

• Revise electrical service to kitchen and serving line equipment as needed.

• Add fly fan at kitchen’s entrance door.

• Repair, resurface and restripe parking lots and entrance drives as required.

Start Design: No Later Than Spring 2015

Start Construction: As Soon as Summer 2016 & No Later Than Summer 2017

Final Completion: No Later Than Fall 2017

 

Oakley Elementary School (2007)

 

Palmetto Elementary School

Major renovation and modification of existing building and site improvements which may include the following work:

• Patch and repair of exterior walls.

• Replace and/or repair of selected doors, windows and hardware.

• Replace as needed marker and tack boards, toilet, toilet partitions and shelving.

• Painting as needed.

• Replacement of floor finishes as needed.

• Replace roof.

• Replacement of vinyl floor tile as required.

• Refinish gymnasium and stage wood flooring

• Replace and/or repair ceramic and quarry floor tile as required.

• Repair terrazzo flooring as required or provide new floor finish.

• Replace acoustical ceiling grid and tile as required.

• Replace and/or repair domestic water piping as required.

• Provide exhaust system for Art Room kilns.

• Provide AC system for LAN Server Room and Workroom.

• Upgrade fire protection sprinkler system as required.

• Update building’s electrical systems as required.

• Replace selected light fixtures in ceiling grid.

• Replace the fire alarm panel and devices as required

• Upgrade the elevator controls.

• Energy conservation improvements as needed.

• Resurface and repair play court.

• Replace and/or repair perimeter fencing around site.

• Replace and upgrade site lighting.

 

Start Design: Complete

Start Construction: Complete

Final Completion: Completed Summer 2015

 

* Additional work at each campus may also include the following improvements as needed: furniture and equipment replacement, visitor identification equipment, access control upgrades and surveillance equipment. Other improvements associated with the integration of system wide technology standards, educational specifications and design requirements may also be included per Fulton County Schools’ Board policy.

***Note – Elementary school play equipment is presently being evaluated for possible upgrade and/or replacement as needed.