Centennial Cluster Improvements

 

 

 

 

Centennial High School

Major renovation and modification of existing building, new security entrance and site improvements which may include the following work:

    • Replacement of floor finishes as needed.

    • Provide painting as necessary.

    • Replace chalkboards with marker boards as necessary.

    • Replace and/or refinish wood flooring in auxiliary gymnasium.

    • Replace and/or repair skylights.

    • Major building HVAC upgrade and replacement.

    • Replace acoustical ceiling tile and grid as required.

    • Upgrade toilet and locker room exhaust systems.

    • Provide exhaust system for art room kilns.

    • Provide AC system for LAN Server Rooms as required.

    • Add hood exhausts in nutrition lab.

    • Upgrade elevator controls.

    • Replace fire alarm panel and devices as required.

    • Revise electrical service to kitchen and serving line equipment as needed.

    • Reconfigure kitchen and dining room for additional serving lines.

    • Energy conservation improvements as needed.

    • Replace sidewalks and pedestrian pavement as necessary.

     

 

Start Design: In Progress

Start Construction: Summer 2016

Final Completion: No Later Than Fall 2017

 

Haynes Bridge Middle School

Major renovation and modification of existing building and site improvements which may include the following work:

• Patch and repair of exterior walls.

• Replacement and/or repair of selected doors, windows and hardware.

• Replace as needed marker/tack boards, lockers, toilet accessories, toilet partitions and shelving.

• Replace as needed fixed furniture such as cabinets, countertops, blinds and fixed seating.

• Painting as needed.

• Replace floor finishes as needed.

• Replace and/or repair ceiling finishes.

• Replace domestic water heater.

• Replace kitchen exhaust hood and fans.

• Update fire alarm system as required.

• Update intercom and sound systems as required.

• Update security system as needed.

• Revise electrical service to kitchen and serving line equipment as needed.

• Reconfigure kitchen and dining room for serving lines.

• Repair, resurface and restripe parking lots as required.

• Replace and/or repair perimeter fencing around site.

 

Start Design: Complete

Start Construction: Complete

Final Completion:  Complete

 

Holcomb Bridge Middle School

Major renovation and modification of existing building and site improvements which may include the following work:

• Replace and/or repair of selected doors, windows and hardware.

• Replace as needed marker and tack boards, lockers, toilet accessories, toilet partitions and shelving.

• Replace as needed fixed furniture such as cabinets, countertops, blinds and fixed seating.

• Provide painting as needed.

• Replacement of floor finishes as needed.

• Refinish gymnasium wood flooring.

• Repair domestic water piping and plumbing fixtures as required.

• Update building’s HVAC system and controls as required.

• Update fire alarm system as required.

• Update security system as needed.

• Update intercom and sound systems as needed.

• Revise electrical service to kitchen and serving line equipment as needed.

• Reconfigure kitchen and dining room for serving line relocation.

• Add fly fan at kitchen’s door entrance.

• Energy conservation improvements as needed.

• Repair, resurface and restripe parking lots and entrance drives as required.

• Replace and/or repair perimeter fencing around site.

• Replace sidewalks as necessary.

 

Start Design: Complete

Start Construction:  Complete

Final Completion: Complete

 

Esther Jackson Elementary School (see New Schools for additional information) 

New school of fifty-four (54) instructional units and associated site improvements to replace the existing elementary school facility.

Start Design: Complete

Start Construction:  In Progress

Final Completion: Fall 2016

 

Hillside Elementary School 

Renovation and modification of existing buildings and site improvements which may include the following:

• Patch and repair of exterior walls.

• Replacement of floor finishes as needed.

• Replacement of vinyl floor tile as required.

• Update security system as required.

• Update fire alarm system as required.

• Replace and/or repair perimeter fencing around site.

 

Start Design: Winter 2015

Start Construction: Summer 2016

Final Completion: No Later Than Fall 2017

 

Northwood Elementary School

Major building renovation and modification of existing building and site improvement which may include the following work:

• Replacement of floor finishes as needed.

• Painting as necessary.

• Major replacement of HVAC system and controls.

• Update intercom and sound systems as required.

• Update fire alarm system as required.

• Update security system as required.

• Revise electrical service to kitchen and serving line equipment as needed.

• Energy conservation improvements as needed.

 

Start Design: Winter 2015

Start Construction: Summer 2016

Final Completion: No Later Than Fall 2017

 

River Eves Elementary School

Major building renovation and modification of existing building and site improvement which may include the following work:

• Replacement of floor finishes as needed.

• Painting as necessary.

• Replace and/or refinish stage wood flooring.

• Major replacement of HVAC system and controls.

• Update intercom and sound systems as required.

• Update fire alarm system as required

• Update security system as required.

• Revise electrical service to kitchen and serving line equipment as needed.

• Energy conservation improvements as needed.

• Repair, resurface and restripe parking lots as required.

 

Start Design: No Later Than Spring 2015

Start Construction: As Soon as Summer 2016 & No Later Than Summer 2017

Final Completion: No Later Than Fall 2017

 

 

* Additional work at each campus may also include the following improvements as needed: furniture and equipment replacement, visitor identification equipment, access control upgrades and surveillance equipment. Other improvements associated with the integration of system wide technology standards, educational specifications and design requirements may also be included per Fulton County Schools’ Board policy.

** Note 1 - Floor covering replacements for elementary schools gymnasiums is complete.

***Note 2 – Elementary school play equipment replacement is currently under construction