Banneker Cluster Improvements

 

 

 

 

Banneker High School

 

New addition of five (5) instructional units for CTE programs.

 

Start Design: Complete

Start Construction: In Progress 

Final Completion:  Summer 2016

 

McNair Middle School

New school of seventy-seven (77) instructional units and associated site improvements to replace the existing middle school facility.

Start Design: Complete

Start Construction: In Progress

Final Completion: Late Fall 2015

 

Bethune Elementary School

Major renovation and modification of existing building and site improvements which may include the following work:

• Replacement and/or repair of selected doors, windows and hardware.

• Provide painting as necessary.

• Replace as needed marker and tack boards, lockers, toilet accessories, toilet partitions    and shelving.

• Replacement of floor finishes as needed.

• Replace gymnasium flooring surface. (Note 1)

• Replace acoustical ceiling grid and tile as required.

• Modifications and renovation of kitchen and serving lines.

• Replace and/or repair domestic water piping, sanitary sewer and plumbing fixtures as   required.

• Update building’s exhaust system as required.

• Replace kitchen exhaust hood and fans.

• Update building’s electrical systems as required.

• Replace selected light fixtures in ceiling grid.

• Replace chairlift.

• Energy conservation improvements as needed.

• Repair, resurface and restripe parking lots and entrance drives as required.

• Replace sidewalks as necessary.

Start Design: In progress

Start Construction: Summer 2015

Final Completion: Summer 2016

 

Feldwood Elementary School – (2010)

Heritage Elementary School

Renovation and modification of existing buildings and site improvements which may include the following:

• Replacement of floor finishes as needed.

• Replace gymnasium flooring surface. (Note 1)

• Painting as needed.

• Update building’s HVAC exhaust system as required.

• Provide exhaust system for Art Room kilns.

• Update intercom and sound systems as required.

• Provide fly fan at kitchen’s entrance door.

• Energy conservation improvements as needed.

• Replace and/or repair perimeter fencing around site.

Start Design: Winter 2015 

Start Construction: Summer 2016

Final Completion: No Latter Than Summer 2017

 

S.L. Lewis Elementary School

Major renovation and modification of existing building and site improvements which may include the following work:

• Patch and repair exterior walls.

• Replacement and/or repair of selected doors, windows and hardware.

• Painting as needed.

• Replace as needed marker and tack boards, toilet accessories, toilet partitions and shelving.

• Replacement of floor finishes as needed.

• Replace gymnasium flooring surface. (Note 1)

• Refinish stage wood flooring

• Replace acoustical ceiling grid and tile as required.

• Replace and/or repair domestic water piping, sanitary waste system and plumbing fixtures    as required.

• Major HVAC upgrade and replacement.

• Upgrade fire protection sprinkler system as required.

• Update building’s electrical systems as required.

• Replace selected light fixtures in ceiling grid.

• Repair, resurface and restripe parking lots and entrance drives as required.

• Replace sidewalks as necessary.

Start Design: Complete

Start Construction: Complete

Final Completion: Complete

 

Love T. Nolan Elementary School

Major renovation and modification of existing building and site improvements which may include the following work:

• Replacement and/or repair of selected doors, windows and hardware.

• Replace as needed marker and tack boards, toilet accessories, toilet partitions, cabinets and countertops.

• Replacement of floor finishes as needed.

• Replacement of vinyl floor tile as required.

• Painting as necessary.

• Replace and/or refinish stage wood flooring.

• Replace acoustical ceiling grid and tile as required.

• Replace and/or repair sanitary sewer system and plumbing fixtures as required.

• Replace selected light fixtures in ceiling grid.

• Update the building’s emergency power system.

• Update sounds systems as needed.

• Update fire alarm system as required.

• Replace gymnasium carpet with vinyl sports flooring.

• Revise electrical service to kitchen and serving line equipment as needed.

• Energy conservation improvements as needed.

• Repair, resurface and restripe parking lots and entrance drives as required.

• Upgrade exterior lighting as needed.

• Replace and/or repair perimeter fencing around site.

• Replace sidewalks as necessary.

Start Design: In progess

Start Construction: Summer 2015

Final Completion: No Later than Summer 2016